March/April Construction

New Room 2007

Construction in March 2007

Cameron and Kyle watching the action, 15 March 2007

15 March 2007

Cameron and Kyle find a good place to watch the action.

Bird's eye view for Cameron and Kyle

15 March 2007

A bird’s eye view for Cameron and Kyle.

Removing the last of the deck

15 March 2007

Removing the last of the deck.

New floor starting to form, 17 March 2007

17 March 2007

New floor is starting to form. Watch the rain gutter spout.

Floor with ducts and insulation after storm, 23 March 2007

23 March 2007

After storm: floor now has ducts and insulation.

Snow and rain, water swept off, 29 March 2007

29 March 2007

A little more snow and lots of rain. They have swept off the water so they can continue to work. Note the rain spout replacement.

Two walls up, third laid out on floor, 29 March 2007

29 March 2007

They have put up two of the walls; it is lightly snowing but clearing. Third wall is laid out on floor.

3 walls up, getting ready for roof, 31 March 2007

31 March 2007

3 walls and getting ready for the roof.

Construction in April 2007

Top of wall added, 2 April 2007

2 April 2007

Top of wall added on Monday.

Putting the roof up, 2 April 2007

2 April 2007

Putting the roof up.

View from the north, 2 April 2007

2 April 2007

View from the north.

New Redbud tree planted, 4 April 2007

4 April 2007

Dad planted a new Redbud tree.

Looking inside the new roof, 4 April 2007

4 April 2007

Looking inside the new roof.

View through windows, 4 April 2007

4 April 2007

You can see through the windows. The deck will go on this side.

Tar paper on the roof, April 9 2007

9 April 2007

Tar paper on the roof.

McKay and Katie in the new room, 9 April 2007

9 April 2007

McKay and Katie in the new room.

McKay and Katie's new car and the roof dumpster, 9 April 2007

9 April 2007

McKay and Katie’s new car and the dumpster for the old roof.

New roof, April 11 2007

11 April 2007

New roof.

New windows installed, April 12 2007

12 April 2007

New windows installed.

Addition wrapped with new windows installed, April 12 2007

12 April 2007

Addition wrapped with new windows installed.

Hole for enlarging end room window, April 13 2007

13 April 2007

Hole for enlarging end room window.

New attic vents, April 13 2007

13 April 2007

New vents to keep the attic cooler.